New construction Karlsruhe Wildpark Stadion
A new home is built for the blue & whites!
Wildparkstadion Karlsruhe
The waiting has been worth it! By mid-2022, a modern future-proof football stadium commissioned by the city of Karlsruhe is to be completed for more than 34,000 spectators. The total cost of the project amounts to some 123 million euros.
Transformer stations from Scheidt GmbH & Co. KG supply the new stadium and premises with power and communication technology.
Scheidt GmbH & Co. KG opted for the HSI150 as a permanently gas and watertight cable entry.
Currently unused openings are sealed gas and watertight with a VS blind plug.
Hauff-Technik solutions | |
---|---|
Specifications
|
HSI 150 cable entry systems
HSI150 system covers with heat shrink sleeves |
Requirements
|
Permanently gas and watertight cable entries
|
Products used
|
HSI150 - K2/x 2 wall inserts
System covers with heat shrink sleeves: HSI150 D3x58 WS HSI150 D7x33 WS VS blind plug |
Verwendete Produkte
Double wall insert
for setting in concrete
HSI150 K2/XFor the gastight and watertight connection on both sides of system seals for cables and cable ducts and …
System cover
cable seal with hot shrink-fit method
HSI150 D WSFor use in wall insert and plastic flange HSI150. The thermal sleeves support a wide area of application, they …
Blind plug
For system cover
VSFor pressure-tight sealing of sockets that are not in use (HSI system covers).